Gold Residences | Parañaque

Project Summary

Location: Sucat Avenue, Parañaque City
Property Type: High-rise condominium, 8 building(s)
Price range: 10.3M and up
Typical floor area: 29.73sqm
Development Stage:Preselling
Building Completion Date(s):Third quarter 2022

Project Details

Storeys: 18-29
Bedrooms: 1
Toilet and bath: 1

Location


  • Ninoy Aquino Avenue, Brgy. Sto. Niño, Sucat, Parañaque City

Getting There

From SLEX

  • Take the Southbound lane of SLEX.
  • Exit at the Sucat Tollgate.
  • From the Sucat Exit, travel straight, then you will see the entryway of the project on the right side.

From Pasay

  • Take Roxas Boulevard going to the direction of Uniwide Coastal Mall.
  • Turn left toward the direction of the NAIA Airport.
  • Follow the road, turning right on the corner leading to NAIA terminal 1.
  • Go straight down Airport Road / Sucat Avenue, until you will see the entryway of the project on the right side.

Road Network

  • NAIA Terminals 1, 2, 3 and 4

Business Areas

  • Parañaque City Hall
  • PAGCOR Entertainment Center
  • Resorts World Manila
  • Okada Manila
  • Solaire Resorts and Casino
  • City of Dreams

 

Commercial Areas

  • SM Hypermarket
  • Waltermart Sucat
  • Puregold Jr.
  • SM City BF Parañaque
  • SM City Sucat
  • SM Mall of Asia
  • SM Sucat
  • S&R Parañaque
  • Duty Free Fiesta Mall

Hospitals

  • Medical Center of Parañaque
  • Parañaque Doctor’s Hospital
  • Asian Hospital and Medical Center
  • The Premier Medical Center
  • Olivares General Hospital
  • San Juan de Dios Hospital
  • Makati Medical Center

Schools

  • St. Paul Parañaque
  • Sacred Heart School
  • Airlink Aviation School
  • Manila Tytana College
  • Southville International School
  • St. James School

Churches

  • Mary Queen of Apostles Parish
  • San Antonio de Padua Parish

Site Development Plan


  • Developer: SMDC
  • Total land area: 11.6 hectares
  • 2 Preselling phases

Phase 1 (Sept 2024)

  • Number of buildings: 3
  • Number of future office towers: 2 towers
  • Number of residential floors: 15 floors
  • Units per floor: 50 units
  • Tower A – 729
  • Tower B – 856
  • Tower C – 883

Phase 2 (Third quarter 2026)

  • Number of buildings: 5
  • Number of residential floors: 29 floors
  • Tower D: 855 units
  • Tower E: 935 Units
  • Tower F: 1,038 units
  • Tower G: 698 units
  • Tower H: 796 units

Unit features

Floor finishes

  • Homogenous tiles for Living/Dining, Kitchen and Bedroom, Toilet and Bath

Wall Finishes

  • Plain cement smooth semi-gloss paint finish with painted wood baseboard for Living/Dining, Kitchen and Bedroom

Ceiling Finishes

  • Off-form skim coat, painted finish ceiling for Living/Dining and Bedroom
  • Gypsum flat paint finish for Kitchen

Kitchen

  • Granite counter top with base and overhead cabinets
  • Cooktop and Rangehood
  • 7kg Front Load Washing Machine
  • Grease Trap

Bedroom

  • 1 Bedroom Unit –Wood laminated sliding door
  • 2 Bedroom Unit –Laminated flush door, wood laminated sliding door

Balcony

  • Concrete wall
  • Steel railing with powder coating

Toilet and Bath

  • Floor to ceiling tiles at Shower area
  • Laminated flush door with non-key lever type
  • Tank type water closet with accessories
  • Vanity counter and facial mirror
  • Shower set

Site Facilities

  • Grand Lobby
  • Clubhouse
  • Children’s Play Area
  • Fitness Gym
  • Landscaped Area
  • Swimming Pools
  • Function Rooms
  • Entertainment Room

Site Features

  • Hotel-like lobbies
  • 4 passenger elevators
  • 1 service elevator per tower
  • Mail room
  • CCTV system
  • Entrance gate
  • Water Catchment System
  • 24-Hour Security System
  • Subterranean Electrical Wires
  • Subterranean Parking
  • Automated Fire Sprinkler System
  • Centralized Garbage Collection and Disposal System
  • Standby Generator for common areas and convenience outlets for residential

Reservation and Payment Options


Reservation Requirements

  • Php15,000.00 reservation fee
  • 2 Valid government issued IDs
  • Marriage certificate (if married)
  • Proof of billing
  • Proof of TIN

Payment Options

  • 100% Spot cash
  • 100% Cash
  • 15% in 48 months, 85% thru cash or bank financing

Other fees and charges

  • Registration fee
  • Documentary stamp
  • Transfer tax
  • Electrical and water connections
  • Legal fees

Accredited Banks

  • BDO

Move-in Requirements

  • Settlement of downpayment
  • Release of bank loan proceeds
  • Settlement of other charges
  • Availability of utilities

Send us a message!

If you have any questions, want to meet up, or need more information, send us a message.

Previous post

My clients since 2012

Next post

The Manansala | Makati